Shape: round, flat, square.
Size Range:
|
Diameter(mm) |
Thickness (mm) |
Width (mm) |
Length(mm) |
Round |
50-420 |
- |
- |
2000-5800 |
Square |
50-420 |
- |
- |
2000-5800 |
flat |
- |
20-50 |
80-600 |
2000-5800 |
Steel-making Condition: EF, EF/EAF+LF+VD, EF/EAF+ESR,
Mechanical Property:
Ultrasonic Test:Material will be ultrasonically tested at appropriate stages of the manufacture to ensure the quality, as agreed between seller and purchaser.
Delivery condition:
Annealed , Quenched + Tempered
Surface Condition:
Black, Grinded, Peeled, Rough turned, Polished
Features
1.Competitive price
2.Immediate delivery
3.Premium quality
4.Reliable service
5.MOQ: 1 Ton
Packing details |
In seaworthy packing, as your requirement. |
Delivery details |
within 30-50 days |
Chemical Compositions:
C |
Mn |
P |
S |
Si |
Cr |
V |
Mo |
0.45-0.55 |
0.20-0.50 |
0.030max |
0.030max |
0.95-1.15 |
4.75-5.50 |
0.80-1.40 |
1.30-1.80 |
Heat treatment:
Hardness :Annealed(+A) max: 248 BHN
Tool steel A9 when heat-treatment the preheat Temperature need reach 788°C, and the temperature may be ± 14 °C .
Tool steel A9 when austenitizing ,should keep 5-15 minutes long. If is the salt bath ,temperature should keep in the 996 °C, and shall be ± 5.6 °C. Or is the controlled atmosphere furnaces, temperature should keep in the 1010 °C, and shall be ± 5.6 °C.
Quenching: Tool steel A9 Hardening quenching using air cooling, and it's hardness min is 56 RC.
Tempering: Tool steel A9 general tempering temperature is 510°C. Double tempering of Double tempering of tool steel A9 is recommended.
![Special Steel A9 Cold Work Tool Steel](//www.micstatic.com/athena/img/transparent.png)
![Special Steel A9 Cold Work Tool Steel](//www.micstatic.com/athena/img/transparent.png)
![Special Steel A9 Cold Work Tool Steel](//www.micstatic.com/athena/img/transparent.png)
![Special Steel A9 Cold Work Tool Steel](//www.micstatic.com/athena/img/transparent.png)